Call us toll free: 01622 678 916
Top notch Multipurpose WordPress Theme!
Jan
10

Flood Defences

by David Skelton in Comments: 0

Holbrook Electrical and Engineering were contacted by the East Kent Engineering Partnership based in Canterbury and tasked with a specialist flood barrier design and build project. We researched the current market looking at readily available system to deploy but no one has designed or manufactured the specialist type of gate the client was looking for. Holbrook Electrical therefore took on the design, manufacture, testing, and installation and commissioning of a vertical raising grade 316 stainless steel, hydraulically operated flood barrier.

Jan
10

Marina Refurb

by David Skelton in Comments: 0

Making upgrading or renewing your marina infrastructure Plain Sailing Marina Refurbishment Holbrook Electrical have carried out extensive Marina refurbishment work both in closed marinas and areas where access for the public has to be maintained. Holbrook Electrical can supply and install a wide range of materials hardwood decking, composite materials and GRP. As a company we can replace decking and service covers, fendering and tray work. We also design and install full electrical and water distribution systems for marinas and can supply a range of Marina equipment. Some of the projects we have worked on include the following: installation of GRP decking to pontoons at Ramsgate Marinas. installation of non slip decking to Dover Harbour Board fuel pontoon and walkway major refurbishment of 27 pontoons in DHB Wellington Dock . installation of GRP decking to all brows at Westminster Pier and Embankment Pier for London River Services. fabrication and installation of pier office platform and GRP decking at Greenwich Pier for London River Services. Installation of HRE design heavy duty power pedestals in Ramsgate for fishing Boat and Wind Farm support vessels. The above is a small selection of the wide range of Marina refurbishment works we offer if you […]

Jan
10

London Array

by David Skelton in Comments: 0

Holbrook are proud to say they were involved in one of the largest offshore wind farms in the word The prestigious London Array Project London Array Holbrook Electrical are proud to have been involved with the prestigious London Array Project the largest offshore wind farm in the world. Holbrook Electrical were asked initially by RNP as their nominated electrical contractor to arrange for power to be laid on to the construction base being set up by Siemens. Holbrook Electrical became an approved main contractor for Siemens Retail and undertook the 200K refurbishment of the old port workshops and proposed maintenance compound. Through this work we became known to Siemens Wind Power who asked us to become nominated contractor. During the construction phase totalling 18 months Holbrook Electrical was charged with supporting and supplying various materials to the land based construction compound. We were also asked at short notice to have components manufactured or to collect urgent parts required for the wind farm towers. We were also involved with lighting upgrades at the site for Health and Safety reasons identified by the Siemens management team who were very proactive with regards to health and safety working practices. Siemens will be returning […]

Jan
10

Switch Gear

by David Skelton in Comments: 0

Get switched on to the retrofit revolution with us Holbrook Electrical started working in supplying and installing switchgear many years ago and we have installed various switchgear and control systems for our clients, Ruskin air, Action Air and Dengie Crops. Holbrook Electrical work closely with our clients to understand their requirements and then engineer them a solution that meets their practical and financial needs. 5 years ago Peter Godden joined us and we moved into Retrofit Switchgear for various clients some of the projects we are associated with is as follows:   ·      Retrofit South Wales Switchgear for RWE. ·      Conveyor system contactors and controls for SSE. ·      Asbestos free Arc Chutes/Flash Guards for SSE. ·      Retrofit Portable earthing solutions for SSE & EDF. ·      Installation of Power Factor Correction Equipment for Dengie Crops. ·      Installation of Power Factor Correction Equipment for Action Air. ·      Installation of Mains Distribution for HICO at Canterbury. ·      Mains distribution upgrades at Morgan Timber.    Above is just a selection of the projects and clients that we have worked for over the years. If you would like any further information or to to discuss any other areas please contact us. Some photos of our […]

Jan
10

Sub Station 2

by David Skelton in Comments: 0
Jan
09

Domestic Projects

by David Skelton in Comments: 0

The Full Design and installation Package Under One Umbrella Holbrook can undertake residential installations as well as commercial and industrial. We have a skilled qualified team that can undertake your standard electrical installation right thorough to specialist areas such as intelligent lighting, AV system and Home cinema rooms. Holbrook have been privilege to work on some large prestige homes as well as multiple dwellings. We have also been featured in some industry magazines such as Hidden Wires and Light news by Philips Dynalite showcasing our quality installations. Our key skills are: Dynalite Dimension dealers  Elan home systems specialists  Audio, Video design and installations Home cinema design and installation Intelligent lighting design and installation Security  Ip Cameras Security Systems    For any more infrormation please don’t hesitate to contact us. Below are some pictures of projects we have undertaken.

Jan
09

Giving working locations A brighter future Holbrook Electrical can design and install totally new systems or work with your existing infrastructure Ramsgate is a good example of this as we undertook work that covered both areas of this requirement. Ramsgate has an array of 25 metre high climbable lighting towers these were fitted initially with expensive floodlights that contained all the control equipment at high level. Due to the aggressive nature of the environment these units rotted through quickly and had a high failure rate, they were expensive to purchase and labour intensive to replace in difficult conditions working at high level. Holbrook Electrical sourced alternate cheaper and more robust fittings. We also designed and built lighting control panels to contain all the control equipment at the base of the column so it could be easily accessed For maintenance, repair and testing. Therefore the high level work was massively reduced and keeping a high level of serviceable units in operation became much easier. Holbrook Electrical have also improved areas of the port lighting as the site has developed. Holbrook Electrical worked with Clancy Docwra to install the services for radiation detection equipment to be installed in the port. As part […]

Jan
09
Jan
09

LinkSpan

by David Skelton in Comments: 0
Jan
09

Office Re-fit

by David Skelton in Comments: 0